Traffic news
Nauvo Northern route - Innamo
Valid thru: 1.6.-10.8.2026
Published on 12.02.2026 13:07
The summer schedule for the Nauvo Northern route for the period 1.6.-10.8.2026 has been published.
Rymättylä route
Valid thru: 4.5.-27.9.2026
Published on 12.02.2026 12:52
The summer schedule fot the Rymättylä route for the period 4.5.-27.9.2026 has been published.
Velkua route Kaita
Valid thru: 8.5.-13.9.2026
Published on 12.02.2026 11:49
The summer schedule for the Velkua route for the period 8.5.-13.9.2026 has been published.
Utö route
Valid thru: 1.6.-30.8.2026
Published on 12.02.2026 11:30
The summer schedule fot the Utö route for the period 1.6.-30.8.2026 has been published.
Kuparonvirta
Valid thru: For the time being
Published on 19.11.2025 15:14
Due to the water level of the lake, we must restrict the load capacity of the Kuparonvirta ferry as follows:
- Maximum cable ferry load capacity: 44 tons
- Maximum permitted weight of a vehicle or vehicle combination: 35 tons
- Maximum permitted length of a vehicle or vehicle combination: 13 meters